绿化工程定额与造价 |
添加时间:2017/12/6 15:36:07 浏览次数: |
一、绿化工程造价的计算方法 First, the calculation method of the cost of the greening project 1.绿化工程造价包括:苗木预算价、种植费、成活率期养护费、管理费、利润、独立费、苗木差价、税金八部分组成。 1., the cost of greening project includes: the budgetary price of seedling, planting fee, survival rate, maintenance fee, management fee, profit, independence fee, seedling price difference and tax eight parts. 2.绿化工程取费基础:苗木预算价。 2. base on the cost of afforestation project: the budgetary price of the seedlings. 二、绿化工程费率 Two. The rate of Greening Engineering 1.种植费:大树10%、小树7% 1. planting fee: big tree 10%, small tree 7% 2.成活率期养护费:正常季节种植12%、反季节种植18% 2. survival rate maintenance fee: normal season planting 12%, anti season planting 18% 3.管理费:3% 3. management fee: 3% 4.利润:2.5% 4. profit: 2.5% 5.税金:城市3.445%、乡镇3.292% 5. tax: City 3.445%, town 3.292% 三、绿化工程定额规定调整说明 Three. The regulation of the regulations on the quota of Greening Engineering 1.苗木预算价格包括:圃存价、挖掘费、泥球包扎费、吊装费、运输费、运输损耗、卸车费、种植损耗、采保费、植物检疫费、苗木经营利润等。 1., the budgetary price of nursery stock includes: nursery stock price, digging fee, mud ball dressing cost, hoisting charge, transportation cost, transportation loss, unloading cost, planting loss, premium, plant quarantine fee, seedling management profit and so on. 2.种植费包括:苗木、草坪的种植及种植后的垃圾及废弃物的清运。大树种植还包括吊装机械费。 2. planting costs include: removal of garbage and waste, lawn planting and planting seedlings after the. The planting of big trees also includes hoisting machinery. 3.成活率期养护费包括:草绳绕树干费、常规支撑费、遮荫棚费、软式通气管费、人工费、水电费等。成活率期是指绿化工程竣工验收后起连续十二个月。 The survival rate of 3. stage maintenance fees include: the rope around the trunk support fees, fees, conventional shade fees, soft ventilation tube costlabour cost and utilities. The survival rate of afforestation period refers to the completion of the project acceptance after twelve consecutive months. 4.管理费包括: 4. the management fee includes: (1)工程所在地范围内的建筑垃圾及其它障碍的清理和外运工作。费用由甲乙双方在合同中说明。 (1) the cleaning and transportation of construction waste and other obstacles within the scope of the project. The cost is explained by the Party A and B in the contract. (2)工程所在地范围内原有苗木的起挖或砍伐挖根;起挖草皮或清除草皮工作。费用由甲乙双方在合同中说明。 (2) project is located within the scope of the original seedling digging or cutting roots; digging turf or sod removal work. The cost is explained by the Party A and B in the contract. (3)原有苗木起挖后的土球包扎或打浆、修剪、出塘、装车搬运工作。费用按实结算。 (3) the soil ball after the original nursery stock is bandaged or beaten, pruned, out of the pond and loading and carrying. The cost is settled in real terms. (4)废弃物运输、场地清理工作。费用按实结算。 (4) waste transportation and site cleaning. The cost is settled in real terms. (5)整理绿化用地费包括:排地表水;耙细、过筛;回填;找平、找坡等工作。 (5) the arrangement of afforestation land fee includes: row of surface water; rake thin, screen; backfilling; leveling, looking for the slope and so on. (6)种植土、营养土:土源由乙方提供,费用由甲乙双方在协商后在合同中注明。 (6) planting soil, nutrition soil: Soil by Party B, charges by both parties indicated in the contract after negotiation. (7)土方造型:机械造型:高度2米以上每立方米1.5元、高度2米以下每立方米1元;人工造型:不分高度每立方米2元。 (7) earthwork modeling: mechanical modeling: 2 meters above the height, 1.5 yuan per cubic meter, 2 yuan per cubic meter, 1 yuan per cubic meter, artificial shape: no matter the height is 2 yuan per cubic meter. (8)土方运输:按市政土方规定(不含土源费)。 (8) earthwork transportation: according to the provisions of the municipal earthwork (excluding the soil source fee). (9)特殊支撑:业主因美化环境而对支撑提特殊要求的支撑(主要指用材)为特殊支撑。费用由甲乙双方协商后在合同中注明。 (9) special support: the support of the owner for the special requirements of the support (mainly used material) for the beautifying the environment is a special support. The cost shall be stated in the contract after negotiation by Party A and B. (10)种植、养护中的水电费由乙方承担。电源、水源由甲方提供,装表计量。如不装表,水电费结算由甲乙双方协商后在合同中注明。 (10) the cost of water and electricity in the cultivation and maintenance shall be borne by Party B. The power supply and water supply are provided by Party A, and the meter is measured. If the table is not installed, the bill of electricity and electricity will be settled in the contract after negotiation between the Party A and the party. (11)灌木种植涉及吊装机械,其费用按实结算。 (11) shrub planting involves hoisting machinery, and its cost is settled in real terms. 6.大树:从地表向上1.2米高处树木的胸径大于等于15厘米。 6. big trees: the diameter of the tree is more than 15 centimeters from the top 1.2 meters above the surface. 7.苗木规格主要指标:乔木以胸径、蓬径为主要控制指标;高为次要控制指标。灌木以蓬径为主要控制指标;干径次要控制指标。 7. the main index of the size of the seedlings: the main control index of the tree is the diameter of the chest and the diameter of the canopy, and the secondary control index is high. The main control index of shrubs was the diameter of the canopy, and the secondary control index of the dry diameter. 8.引进新品种苗木,没有公布预算价格的苗木由甲乙双方协商后在合同中注明。 8. the introduction of new varieties of seedlings, without the release of budgetary prices of seedlings by the two parties after negotiation in the contract in the contract. 9.反季节种植:为6、7、8、9月期间种植。 9. anti season planting: planting for the period of 6, 7, 8, and September. 10.正常养护:指成活率期结束以后的养护。费用由甲乙双方协商后在合同中注明。 10. normal maintenance: refers to the maintenance after the end of the survival rate. The cost shall be stated in the contract after negotiation by Party A and B. 11.苗木差价:实际采购价—苗木预算价。 11. the price difference between the seedlings: the actual purchase price - the budgetary price of the seedlings. 12.没有预算价的,直接以采购价(至工地)进入预算价,并计取各类费用。 12. no budget price, direct purchase price (to the site) into the budget price, and take into account the various types of costs. 13.管理费中含0.1%的定额测定费。 13. the fee for the determination of the quota of 0.1% is included in the management fee. 四、费率表 Four, rate table 1.苗木预算总价 1. budgetary total price of seedlings 2.种植费:1*10%(7%) 2. planting fee: 1*10% (7%) 3.成活率期养护费:1*12%(18%) 3. survival rate maintenance fee: 1*12% (18%) 4.管理费:1*3% 4. management fee: 1*3% 5.利润:1*2.5% 5. profit: 1*2.5% 6.独立费 6. independent fee 7.苗木差价:实际价—预算价 7. stock price difference: actual price - budgetary price 8.税金:(1+2+3+4+5+6+7)*3.445%(3.292%) 8. tax: (1+2+3+4+5+6+7) *3.445% (3.292%) |
上一页 苗木销售,苗圃经营,怎样才能避免风险更赚钱 |
下一页 绿化苗木生产新技术,苗木人要学起来了! |
Copyright © 技术支持:遨游网络